A gas-fired indirect bath heater that raises well fluid temperature ahead of the separator, preventing hydrate and wax formation and improving oil/water separation efficiency. Stocked in Tripoli and ready to mobilize — no international freight, no customs delay.
An indirect bath heater is a fired vessel that heats a water bath surrounding a coil of process piping, raising the temperature of well fluid passing through the coil without exposing it directly to the flame — reducing the risk of coking or localized overheating.
During well testing, heating the produced fluid ahead of the separator helps prevent hydrate and wax formation in cold or high-pressure gas streams, reduces fluid viscosity, and improves the efficiency and accuracy of downstream oil/water/gas separation.
Medit Oil Services stocks gas-fired indirect bath heaters sized to support well test operations across Libya's coastal and desert fields, available as a standalone rental or as part of a full surface test package.
See heater specifications below, or tell us your expected flow rates and fluid temperatures in the form and we'll confirm the right unit and availability. View specifications ↓
A gas-fired indirect bath heater for well fluid temperature control, stocked in Tripoli and ready to mobilize.
Indirect-fired, water-bath design. Gas-fired burner, field gas or supplied fuel gas.
High-pressure rated coil rated for well test service. Thermostatic burner control with high-limit safety cutout.
Low-water and flame-failure shutdown protection. Skid-mounted for fast rig-up and transport.
An indirect bath heater engineered for safe, consistent heating, stocked locally and maintained to international standards.
Raises well fluid temperature ahead of the separator, reducing the risk of hydrate and wax formation in cold or high-pressure streams.
A water-bath design heats the process coil indirectly, avoiding direct flame contact and reducing coking risk on high-viscosity fluids.
Our inventory is already on the ground in Libya — no international freight or customs delay, with dispatch straight from our Tripoli yard.
Take the heater on a straight rental, or add our qualified crew for a full-service operated well test.
Day rates, monthly rates, or long-term frame agreements — structured around your project timeline.
A dedicated point of contact stays with the job for the full rental period — for swaps, extensions, or field issues.
Indirect bath heater rental supports reliable fluid conditioning at every stage of well test operations, particularly on cold or waxy streams.
Raising gas and fluid temperature to keep conditions outside the hydrate formation envelope during flow testing.
Reducing fluid viscosity and preventing wax deposition on high-pour-point crude during well testing.
Improving oil/water/gas separation efficiency by conditioning fluid temperature ahead of the separator.
Maintaining consistent fluid temperature during sustained-flow testing over longer periods.
We eliminate international mobilization cost and delay. Our inventory is already on Libyan soil — ready the moment you call.
Our full inventory is in Tripoli right now. No freight bills, no weeks at customs. You mobilize faster and cheaper than any competitor sourcing from outside Libya.
Locally available equipment reduces the time, logistics and costs associated with international mobilization.
Every unit is inspected and serviced before it leaves our yard. Crews experienced in Libyan field conditions, from coastal sites to remote desert locations.
Day rates, monthly rates, or long-term frame agreements. Contracts structured to your timeline — one well test or a multi-year campaign.
A straightforward process, built around how fast well test operations actually move.
Tell us the specifications, pressure ratings, location, and dates. Takes two minutes via the form or a direct call.
We confirm availability, day rate, and contract terms — typically within 24 hours, often the same day.
The equipment moves from our Tripoli yard straight to your site. No import wait, no customs delay.
A dedicated contact stays with the job for the full rental period — swaps, extensions, or field issues.
An indirect bath heater raises the temperature of well fluid passing through a process coil surrounded by a heated water bath, preventing hydrate and wax formation and improving separation efficiency ahead of the separator.
Indirect heating avoids exposing the process fluid directly to the flame, reducing the risk of coking, localized overheating, and hot-spot damage — important for viscous or waxy crudes.
Yes. Our heaters are stocked in Tripoli, so there's no international freight or customs delay — equipment can typically mobilize the same day.
Both. You can rent the heater directly, or have our qualified crew operate it for you under a full-service well test contract.
The heater is gas-fired and can typically run on field gas from the well test or a supplied fuel gas source — tell us your available fuel and we'll confirm compatibility.
Yes. Alongside heaters, we supply separators, surge tanks, gauge tanks, and complete well test equipment packages, all stocked in Tripoli. View our full equipment range →
Tell us your requirements. We respond within 24 hours with availability and day rates.