Home/ Equipment/ Flare Boom with King Post Rental in Libya
Tripoli, Libya · Well Test Equipment

Flare Boom with King Post Rental in Libya

A free-standing king post flare boom that positions the flare stack a safe horizontal distance from personnel and equipment during well testing, with remote pilot ignition and a multi-jet tip for clean, controlled combustion. Stocked in Tripoli and ready to mobilize — no international freight, no customs delay.

25+
Years of experience
24H
Quote Turnaround
100%
Locally Stocked
Flex.
Contract Terms
Medit Oil Services flare boom with king post
Medit equipment · Enhanced from an equipment photograph
Flare Boom System Key Specifications
Boom Length100 ft (30 m) horizontal reach
Support StructureFree-standing king post, guy-wire supported
Flare TipMulti-jet tip for clean, controlled combustion
Ignition SystemRemote pilot with electric/piezo igniter
In stock — 100 ft boom, remote ignition, ready to mobilize
How It Works

What Is a King Post Flare Boom?

A king post flare boom is a free-standing structural boom, supported and guyed from a central king post, that carries the flare line and tip a safe horizontal distance away from the wellsite, personnel, and equipment before gas is ignited and burned off.

During well testing, separated or unprocessed gas that can't be routed to a sales line or vented safely is directed down the boom to the flare tip, where it is ignited and combusted in a controlled manner — a critical safety and environmental step on every test.

Medit Oil Services stocks a free-standing 100 ft king post flare boom, complete with multi-jet flare tip and remote pilot ignition system, sized to support well test operations across Libya's coastal and desert fields.

Need a specific boom length or ignition setup?

See structural and ignition specifications below, or tell us your site layout and gas rates in the form and we'll confirm the right configuration and availability. View specifications ↓

Equipment Details

Flare Boom Technical Profile

A free-standing king post boom system, engineered for safe stand-off distance and reliable ignition, stocked in Tripoli and ready to mobilize.

Reach & support

100 ft (30 m) horizontal reach. Free-standing king post, guy-wire supported.

Flare tip & ignition

Multi-jet tip for clean, controlled combustion. Remote pilot with electric/piezo igniter.

Flare line & deployment

High-pressure rated flare line. Skid or trailer-transportable sections.

For your rental enquiryBoom length and support configuration can be adjusted to site layout and required stand-off distance. Contact us with your site plan and expected gas rates and we'll confirm the best configuration for your well test.
Rental Capabilities

Built Around Safe Flaring Operations

A flare boom system engineered for safety and reliability, stocked locally and maintained to international standards.

100 ft Safe Stand-Off

A free-standing king post boom carries the flare tip 100 ft horizontally from the wellsite, keeping personnel and equipment a safe distance from the flame.

Remote Pilot Ignition

Electric/piezo remote ignition system lights the pilot and multi-jet tip without requiring personnel near the flare stack.

Stocked in Tripoli, Ready Now

Our inventory is already on the ground in Libya — no international freight or customs delay, with dispatch straight from our Tripoli yard.

Rental or Fully Operated Service

Take the flare boom on a straight rental, or add our qualified crew for a full-service operated well test.

Flexible Commercial Terms

Day rates, monthly rates, or long-term frame agreements — structured around your project timeline.

Support Through the Rental

A dedicated point of contact stays with the job for the full rental period — for swaps, extensions, or field issues.

Where It's Used

Well Testing Applications

Flare boom rental supports safe gas disposal at every stage of well test operations, from first exploration flow to extended production testing.

01

Exploration Well Testing

Safely flaring produced gas during initial flow-back and clean-up of newly drilled wells.

02

Production & Extended Well Testing

Continuous, controlled flaring during sustained-flow testing over longer periods.

03

Well Clean-Up & Completion

Burning off gas during well clean-up and completion operations before tie-in to production.

04

HSE & Environmental Compliance

Providing a safe, controlled combustion point that meets HSE and environmental requirements on site.

Why Medit Oil Services

The Local Advantage

We eliminate international mobilization cost and delay. Our inventory is already on Libyan soil — ready the moment you call.

Equipment Already in Libya

Our full inventory is in Tripoli right now. No freight bills, no weeks at customs. You mobilize faster and cheaper than any competitor sourcing from outside Libya.

Competitive Pricing

Locally available equipment reduces the time, logistics and costs associated with international mobilization.

Field-Proven Reliability

Every unit is inspected and serviced before it leaves our yard. Crews experienced in Libyan field conditions, from coastal sites to remote desert locations.

Flexible Rental Terms

Day rates, monthly rates, or long-term frame agreements. Contracts structured to your timeline — one well test or a multi-year campaign.

Standards & Compliance
API Standards
ASME B31.3
ISO 9001-Aligned QA/QC
HSE Compliant
How It Works

From Request to Mobilization

A straightforward process, built around how fast well test operations actually move.

1

Request

Tell us the specifications, pressure ratings, location, and dates. Takes two minutes via the form or a direct call.

2

Confirm

We confirm availability, day rate, and contract terms — typically within 24 hours, often the same day.

3

Mobilize

The equipment moves from our Tripoli yard straight to your site. No import wait, no customs delay.

4

Support

A dedicated contact stays with the job for the full rental period — swaps, extensions, or field issues.

Frequently Asked Questions

Common Questions

What is a flare boom with king post used for?

A king post flare boom is a free-standing structural boom that carries the flare line and tip a safe horizontal distance from the wellsite, so gas that can't be routed to sales can be ignited and burned off in a controlled manner away from personnel and equipment.

How long is your flare boom, and how is it supported?

Our boom provides a 100 ft horizontal reach and is supported by a free-standing king post with guy-wire bracing — no crane or permanent structure required at the wellsite.

How is the flare ignited?

The system uses a remote pilot with electric/piezo ignition, so the flare can be lit and monitored without personnel approaching the flare tip.

Do you have a flare boom available for rental in Libya right now?

Yes. Our flare boom is stocked in Tripoli, so there's no international freight or customs delay — equipment can typically mobilize the same day.

Can I rent the flare boom with an operating crew, or equipment only?

Both. You can rent the flare boom directly, or have our qualified crew rig it up and operate it for you under a full-service well test contract.

Do you also supply other well testing equipment in Libya?

Yes. Alongside flare booms, we supply separators, choke manifolds, ESD systems, and complete well test equipment packages, all stocked in Tripoli. View our full equipment range →

Get In Touch

Request a Flare Boom Rental Quote

Tell us your requirements. We respond within 24 hours with availability and day rates.

Location
Tripoli, Libya
Response Time
Within 24 hours
Urgent mobilization? Note it in your message — we prioritize time-sensitive requests and often respond within hours on business days.

Send a Rental Request
✓  Request sent — we will respond within 24 hours.